EPISODE · Aug 14, 2026 · 1 MIN
Airport Connector Tunnel Repaving Begins | Las Vegas News
from Las Vegas News Today | 2 Min Now | The Daily News Now!
Harry Reid International Airport is tackling its biggest infrastructure upgrade in 32 years — repaving the Airport Connector Tunnel to smooth out the ride and boost campus access. But don’t pack your bags just yet: expect five months of major traffic headaches, with only two lanes open each way during peak hours and just one lane at night. Plan ahead, allow extra travel time, and check the airport’s website for updates. The $2.4M project, handled by Las Vegas Paving, is battling mineral buildup from hard water — and it’s happening alongside other nearby roadwork on Sunset Road and I-215, making this a multi-front traffic challenge. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/10ea040191790df4
Embed this episode
Ready to play
Airport Connector Tunnel Repaving Begins | Las Vegas News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.