Airport Terminal Renovation Traffic Update | Dayton News episode artwork

EPISODE · Sep 9, 2026 · 1 MIN

Airport Terminal Renovation Traffic Update | Dayton News

from Dayton News Today | 2 Min News | The Daily News Now!

Traffic’s getting a major overhaul at John Glenn Columbus International Airport as construction ramps up for the 2029 terminal expansion. Eastbound International Gateway is shifting closer to the new terminal, and key routes—including the rental car loop and the old cell phone lot—are gone. Drivers now must navigate new exits, U-turns, and parking spots like Lane Aviation or the Green Lot. Leaving the terminal? No more hotel loops—head straight to Sawyer Road. Expect detours as crews build a future with 36 gates and a fresh food-and-shop hub. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/2c1a25a4650f2210

Episode metadata supplied by the publisher feed · Published Sep 9, 2026

Embed this episode

Ready to play

Airport Terminal Renovation Traffic Update | Dayton News

0:00 1:41

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Dayton News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Dayton News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on September 9, 2026.

Can I download this Dayton News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!