Skip to content
AI’s Power Gap and Nuclear’s Return with The Nuclear Company episode artwork

Oct 7, 2025 54 min

AI’s Power Gap and Nuclear’s Return with The Nuclear Company

from Inevitable Hosted by Juliann Edwards, Cody Simms

Juliann Edwards is Chief Development Officer at The Nuclear Company. The United States has 93 operating nuclear reactors providing about 20% of the nation’s electricity. After decades without new builds, Vogtle Units 3 and 4 in Georgia finally came online—despite cost overruns and delays that nearly derailed the project. Meanwhile, China has dozens of reactors under construction and is on pace to surpass the U.S. as the world’s nuclear leader by 2030. At the same time, an energy-demand gap—driven by AI data centers, reshoring of manufacturing, and widespread electrification—has put nuclear back in the conversation. Hyperscalers like Microsoft, Google, Amazon, and Meta are scrambling for clean, reliable baseload power. The Nuclear Company believes it can crack what’s held nuclear back in America. Rather than inventing new reactor designs, they’re using proven models like and targeting “the other 88%” of costs—construction, financing, and project management. Their approach is fleet-scale deployment: building multiple reactors at once to drive down costs through repetition and shared learning. They’re also partnering with Palantir to build an AI-powered operating system to orchestrate these projects. Beyond her role at The Nuclear Company, Juliann chairs U.S. Women in Nuclear. With 15 years in the industry—from steel commodities to the 2000s nuclear renaissance and the decommissioning wave—she’s seen the cycles and why today’s interest feels different. MCJ is a multiple-time investor in The Nuclear Company through our venture funds. Episode recorded on Aug 7, 2025 (Published on Oct 7, 2025) In this episode, we cover: [2:57] Juliann’s background and path to nuclear [05:30] Women in Nuclear’s mission and growth [06:38] Lessons from a six‑state nuclear bus tour [08:22] NIMBY sentiment shifting toward nuclear acceptance [10:25] U.S. build history and why it stalled [18:06] What went wrong and right at Vogtle [24:05] Nuclear reactor ~12% of cost; 88% is everything else [25:42] Workforce gaps and training pipelines [26:40] An overview of nuclear project types [32:59] Timelines: restarts soon; new builds in years [34:42] TNC’s executive makeup [37:40] The role of the Nuclear Regulatory Commission [40:35] Palantir and TNC’s newly announced partnership [48:35] Solving the nuclear waste problem [50:30] Juliann’s predictions for the future of nuclear [53:10] Hyperscalers’ evolving nuclear appetite Enjoyed this episode? Please leave us a review! Share feedback or suggest future topics and guests at [email protected]. Connect with Override: Cody Simms on LinkedIn Visit ovr.vc Subscribe to the Override Newsletter *Editing and post-production work for this episode was provided by The Podcast Consultant

Episode details come from the podcast's RSS feed.

Embed this episode

Juliann Edwards is Chief Development Officer at The Nuclear Company. The United States has 93 operating nuclear reactors providing about 20% of the nation’s electricity. After decades without new builds, Vogtle Units 3 and 4 in Georgia finally came online—despite cost overruns and delays that nearly derailed the project. Meanwhile, China has dozens of reactors under construction and is on pace to surpass the U.S. as the world’s nuclear leader by 2030. At the same time, an energy-demand gap—driven by AI data centers, reshoring of manufacturing, and widespread electrification—has put nuclear back in the conversation. Hyperscalers like Microsoft, Google, Amazon, and Meta are scrambling for clean, reliable baseload power. The Nuclear Company believes it can crack what’s held nuclear back in America. Rather than inventing new reactor designs, they’re using proven models like and targeting “the other 88%” of costs—construction, financing, and project management. Their approach is fleet-scale deployment: building multiple reactors at once to drive down costs through repetition and shared learning. They’re also partnering with Palantir to build an AI-powered operating system to orchestrate these projects. Beyond her role at The Nuclear Company, Juliann chairs U.S. Women in Nuclear. With 15 years in the industry—from steel commodities to the 2000s nuclear renaissance and the decommissioning wave—she’s seen the cycles and why today’s interest feels different. MCJ is a multiple-time investor in The Nuclear Company through our venture funds.

Ready to play

AI’s Power Gap and Nuclear’s Return with The Nuclear Company

0:00 54:58

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Inevitable?

This episode is 54 minutes long.

When was this Inevitable episode published?

This episode was published on October 7, 2025.

Can I download this Inevitable episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.