Albalat de La Ribera inicia las obras de limpieza y adecuación del río Júcar episode artwork

EPISODE · Sep 7, 2026 · 1 MIN

Albalat de La Ribera inicia las obras de limpieza y adecuación del río Júcar

from Alzira

Tras la actuación se creará un nuevo sendero fluvial que unirá los dos antiguos muelles areneros del municipio

Episode metadata supplied by the publisher feed · Published Sep 7, 2026

Embed this episode

Ready to play

Albalat de La Ribera inicia las obras de limpieza y adecuación del río Júcar

0:00 1:15

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Alzira?

This episode is 1 minute long.

When was this Alzira episode published?

This episode was published on September 7, 2026.

Can I download this Alzira episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!