Aldebaran Drills to Upgrade Altar Ahead of Key Catalysts episode artwork

EPISODE · May 21, 2026 · 17 MIN

Aldebaran Drills to Upgrade Altar Ahead of Key Catalysts

from Mining Stock Daily · host Trevor Hall

Aldebaran Resources continues advancing the massive Altar copper-gold project in Argentina with new infill drill results aimed at upgrading inferred resources into measured and indicated categories ahead of next year’s pre-feasibility study. CEO John Black discusses the latest wide intercepts from Altar East and Altar United, the ongoing geotechnical drilling campaign, and how the company is evaluating different development scenarios ranging from a hybrid open pit-underground operation to a potentially larger-scale mine plan. The conversation also touches on key upcoming catalysts including a new mineral resource estimate expected later this year, potential participation in Argentina’s RIGI incentive framework, and the continued advancement of the Centenario spinout package. With more drill results pending and the project steadily moving toward pre-feasibility, Aldebaran says Altar is entering a critical stage of long-term de-risking and value creation.

Episode metadata supplied by the publisher feed · Published May 21, 2026

Embed this episode

NOW PLAYING

Aldebaran Drills to Upgrade Altar Ahead of Key Catalysts

0:00 17:21

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Mining Stock Daily?

This episode is 17 minutes long.

When was this Mining Stock Daily episode published?

This episode was published on May 21, 2026.

Can I download this Mining Stock Daily episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!