Alternative Disruptors: The 'All of the Above' Approach for Data Centers episode artwork

EPISODE · Feb 26, 2026 · 50 MIN

Alternative Disruptors: The 'All of the Above' Approach for Data Centers

from Commercial Property Executive · host Commercial Property Executive

After the U.S.'s nearly 20-year stretch of little to no electricity load growth, we’re now shifting into an age where new investments are needed to sustain the pace of demand from AI and hyperscale data center users.Current U.S. data center market trends point to ever-increasing levels of development complexity, with gigawatt-scale campuses now a reality. Tom Traugott, SVP of emerging technologies at EdgeCore Digital Infrastructure joins us on this second episode of Alternative Disruptors to discuss this new paradigm, breaking down what the baseline will be from 2026 onward.“I think the industry has started to recognize that there's four dimensions that can slow down AI. Those are chips, data, networking throughput and power. Power is the lowest ceiling we’re encountering right now.”Unlocking new megawatts, or even stranded ones, will take a new approach to capex investment. From regulatory realignment to utilizing on-site generation and flexible loads, the data center sector is getting ready to solve these challenges from all angles possible, or, as Tom puts it, the “all of the above approach".Here’s a breakdown of the discussion:(00:00) Introduction(00:50) Meet Tom Traugott(01:17) EdgeCore’s strategy shift(05:11) The power wall & unlocking gigwatts(09:27) Grid flexibility playbook(11:32) What energy alternatives are viable?(14:03) Nat gas now, nuclear later(19:24) Speed economics pressure(20:58) New AI scaling laws(25:59) Bottlenecks: cooling, supply chains, labor shortage(30:56) Community relations(33:16) Liquid cooling reality check & heat risks, redundancy(39:21) Sustainability offsets & the grid(44:27) Three bold bets for 2026(50:05) Closing thanks & outro

Episode metadata supplied by the publisher feed · Published Feb 26, 2026

Embed this episode

NOW PLAYING

Alternative Disruptors: The 'All of the Above' Approach for Data Centers

0:00 50:54

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Commercial Property Executive?

This episode is 50 minutes long.

When was this Commercial Property Executive episode published?

This episode was published on February 26, 2026.

Can I download this Commercial Property Executive episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!