EPISODE · Mar 13, 2018 · 6 MIN
AM Fox Valley-DOT's Tom Buchholz 3/13/18
from AM Fox Valley · host Dave Edwards
Tom takes us thru the progress on the 441-41 project, a traffic change coming up and the timeline for future work.
Embed this episode
NOW PLAYING
AM Fox Valley-DOT's Tom Buchholz 3/13/18
0:00
6:18
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of AM Fox Valley?
This episode is 6 minutes long.
When was this AM Fox Valley episode published?
This episode was published on March 13, 2018.
Can I download this AM Fox Valley episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!