Ames-Kraemer JV Just Won the $1.4B Blatnik Bridge — What the Twin-Ports Design-Build Selection Means for Infrastructure Contractors in 2026 episode artwork

EPISODE · Jul 1, 2026 · 19 MIN

Ames-Kraemer JV Just Won the $1.4B Blatnik Bridge — What the Twin-Ports Design-Build Selection Means for Infrastructure Contractors in 2026

from The Deep Dive: Where Elite Builders Share the Secrets Behind Their Success

The Minnesota and Wisconsin Departments of Transportation this week selected Ames-Kraemer Joint Venture II as the apparent best-value proposer for the $1.4 billion design-build replacement of the John A. Blatnik Bridge connecting Duluth, Minnesota and Superior, Wisconsin. Ames-Kraemer's design-build bid was approximately $930 million, with the total project estimated at $1.4 billion. The contract has not yet been formally awarded — the states have up to 60 days to finalize. Separately, Parsons w

Episode metadata supplied by the publisher feed · Published Jul 1, 2026

Embed this episode

Ready to play

Ames-Kraemer JV Just Won the $1.4B Blatnik Bridge — What the Twin-Ports Design-Build Selection Means for Infrastructure Contractors in 2026

0:00 19:36

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Deep Dive: Where Elite Builders Share the Secrets Behind Their Success?

This episode is 19 minutes long.

When was this The Deep Dive: Where Elite Builders Share the Secrets Behind Their Success episode published?

This episode was published on July 1, 2026.

Can I download this The Deep Dive: Where Elite Builders Share the Secrets Behind Their Success episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!