An RFI can Satisfy Notice Requirement, said the Feds episode artwork

EPISODE · May 7, 2018 · 7 MIN

An RFI can Satisfy Notice Requirement, said the Feds

from Build America Podcast · host Scott Jennings

Possibly the leading cause of contractor claim denials – lack of proper notice – just got a little bit easier for contractors thanks to the U.S. Armed Services Board of Contract Appeals’ conclusion that a request for information (RFI) can satisfy a notice requirement under F.A.R. (Federal Acquisition Regulation). http://sjcivil.net/sjcc/an-rfi-can-satisfy-notice-requirement-said-the-feds/

Episode metadata supplied by the publisher feed · Published May 7, 2018

Embed this episode

NOW PLAYING

An RFI can Satisfy Notice Requirement, said the Feds

0:00 7:09

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Build America Podcast?

This episode is 7 minutes long.

When was this Build America Podcast episode published?

This episode was published on May 7, 2018.

Can I download this Build America Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!