EPISODE · May 21, 2026 · 27 MIN
Another change order?
from The Boardroom Podcast · host Chad Wicker and Ben Piper
On the latest episode of the Roundabout roundup, Brian and Chad catch you up on what’s going on in Hernando, break a new restaurant coming to town, and highlight the May 19th Hernando Board of Alderman Meeting.
Embed this episode
Ready to play
Another change order?
0:00
27:03
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of The Boardroom Podcast?
This episode is 27 minutes long.
When was this The Boardroom Podcast episode published?
This episode was published on May 21, 2026.
Can I download this The Boardroom Podcast episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!