Another week of Raglan talking to Raglan episode artwork

EPISODE · Aug 25, 2026 · 1H 25M

Another week of Raglan talking to Raglan

from Raglan Talking to Raglan

Regional Council's Future Proof committee has a Where we will grow map showing where extra housing is planned and has planned for how most areas will cope with the extra people, but for Raglan only the location and water services have been planned. That seems to account for places such as Te Kauwhata, with less traffic, fewer tourists and a smaller population, getting an hourly bus, when Raglan is having to lobby Regional Council at their Regional Transport Committee Public Transport Subcommittee meeting at 1.15pm on Mon 14 September at 160 Ward St.Regional Council has also been talking about the cost and increasing frequency of climate change weather events, with graphs showing insurance costs and rainfall extremes.Electrification is a way to reduce carbon emissions. This graph from https://www.rewiring.nz/electrification-guides/get-started shows that, even using borrowed money, over $3,000 a year can be saved by electrifying an average house.

Episode metadata supplied by the publisher feed · Published Aug 25, 2026

Embed this episode

Ready to play

Another week of Raglan talking to Raglan

0:00 1:25:42

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Raglan Talking to Raglan?

This episode is 1 hour and 25 minutes long.

When was this Raglan Talking to Raglan episode published?

This episode was published on August 25, 2026.

Can I download this Raglan Talking to Raglan episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!