Answering your data center questions episode artwork

EPISODE · Jun 18, 2026 · 50 MIN

Answering your data center questions

from This Is Nashville · host WPLN News - Nashville Public Radio

Tech developer DC Blox has filed permit applications for a tentacular data center to be built right next to the Nashville Zoo. A 'Quantum Leap' data center is underway on Fisk University's campus.These constructions have seemingly started to pop up nationwide. And they were showing no sign of slowing. That is, until the public had something to say about it. Americans from all political walks of life are protesting the sudden mitosis of these mysterious buildings. A petition opposing the data center by the Zoo has garnered over 400,000 signatures.Still, questions remain: are they harmful to the surrounding ecosystem? Are they loud? Are they creating jobs? Are they taking jobs away?On today's Roundabout edition, our panel is here to answer your questions. Call in with your thoughts and concerns at 615-760-2000 or comment on the YouTube livestream.This episode was produced by Josh Deepan. Guests Caroline Eggers, WPLN Environmental Reporter Timothy Hughes, NCAA Nashville Chapter President Dodd Galbreath, Lipscomb University Environmental Science Professor Kelly Puente, Investigative Reporter, The Tennessean 

Episode metadata supplied by the publisher feed · Published Jun 18, 2026

Embed this episode

NOW PLAYING

Answering your data center questions

0:00 50:02

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of This Is Nashville?

This episode is 50 minutes long.

When was this This Is Nashville episode published?

This episode was published on June 18, 2026.

Can I download this This Is Nashville episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!