Are listed buildings holding up development? episode artwork

EPISODE · Aug 3, 2026 · 28 MIN

Are listed buildings holding up development?

from Behind the Story · host RTÉ News

Moore St, GPO, James Weir building, RTÉ campus: just some of the many listed buildings that are part of Ireland's heritage, but are restrictions on their use and climate obligations holding up future development of these buildings? UCD Assistant Professor of Architecture Orla Hegarty joins Fran for a chat about why buildings are protected and what can be done with some of the ones lying idle. See omnystudio.com/listener for privacy information.

Episode metadata supplied by the publisher feed · Published Aug 3, 2026

Embed this episode

Ready to play

Are listed buildings holding up development?

0:00 28:32

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Behind the Story?

This episode is 28 minutes long.

When was this Behind the Story episode published?

This episode was published on August 3, 2026.

Can I download this Behind the Story episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!