EPISODE · Oct 20, 2025 · 20 MIN
Arizona Sonoran's George Ogilvie Breaks Down today's PFS for the Cactus Project
from Mining Stock Daily · host Trevor Hall
Arizona Sonoran CEO, George Ogilvie, joins the podcast late today for a discussion on the announced and updated preliminary feasibility study for the Cactus Project. The report highlights an open-pit / SXEW operation producing approximately 103,000 tonnes (226 million lbs) of estimated average annual copper cathodes over the first 10 years of mining, which would make Cactus the third largest cathode producer in the USA. We discuss the economics of the project within this report, the changes from the PEA, and the opportunities for future mine financing.
What this episode covers
Arizona Sonoran CEO, George Ogilvie, joins the podcast late today for a discussion on the announced and updated preliminary feasibility study for the Cactus Project. The report highlights an open-pit / SXEW operation producing approximately 103,000 tonnes (226 million lbs) of estimated average annual copper cathodes over the first 10 years of mining, which would make Cactus the third largest cathode producer in the USA. We discuss the economics of the project within this report, the changes from the PEA, and the opportunities for future mine financing.
NOW PLAYING
Arizona Sonoran's George Ogilvie Breaks Down today's PFS for the Cactus Project
No transcript for this episode yet
Similar Episodes
No similar episodes found.