Artemis Gateway Power Contract Awarded | Miami News episode artwork

EPISODE · Sep 13, 2026 · 1 MIN

Artemis Gateway Power Contract Awarded | Miami News

from Miami News Today | 2 Min News | The Daily News Now!

NASA just handed Maxar Technologies a $138 million contract to build the power and propulsion element for the lunar gateway — the critical engine room that will keep the moon station alive and orbiting. Set for launch in 2024, this milestone signals serious momentum for Artemis, paving the way for sustained lunar operations and eventually Mars missions. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Sources:https://www.nbcmiami.com/news/local/1-dead-3-children-hospitalized-after-overnight-crash-in-deerfield-beach-fire-rescue-says/3858503/ More coverage & latest updates:https://sources.thednn.ai/efe6f8fcd3303043 Report issues to [email protected].

Episode metadata supplied by the publisher feed · Published Sep 13, 2026

Embed this episode

Ready to play

Artemis Gateway Power Contract Awarded | Miami News

0:00 1:27

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Miami News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Miami News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on September 13, 2026.

Can I download this Miami News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!