Ask Paul | Metal-Clad Cable and Moisture episode artwork

EPISODE · Oct 16, 2024 · 17 MIN

Ask Paul | Metal-Clad Cable and Moisture

from Master The NEC - PODCAST · host Paul W. Abernathy

Today we have the following question:A job site that we are on recently had the roof drains improperly opened and the MC that was installed got wet. I've recently heard the podcast where this was the topic in question, but for Type NM cable. Is the affected MC ok to remain or should it be replaced?Become a supporter of this podcast: https://www.spreaker.com/podcast/master-the-nec-podcast--1083733/support.Struggling with the National Electrical Code? Discover the real difference at Electrical Code Academy, Inc.—where you’ll learn from the nation’s most down-to-earth NEC expert who genuinely cares about your success. No fluff. No gimmicks. Just the best NEC training you’ll actually remember.Visit https://FastTraxSystem.com to learn more.

Episode metadata supplied by the publisher feed · Published Oct 16, 2024

Embed this episode

Ready to play

Ask Paul | Metal-Clad Cable and Moisture

0:00 17:57

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Master The NEC - PODCAST?

This episode is 17 minutes long.

When was this Master The NEC - PODCAST episode published?

This episode was published on October 16, 2024.

Can I download this Master The NEC - PODCAST episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!