Skip to content
Audiolectura comunicado 187 episode artwork

Apr 14, 2021 6 min

Audiolectura comunicado 187

from Comunicados de Prensa 2020

Entre los casos emblemáticos que adelanta la Gerencia Departamental de la CGR se destaca el relativo al irregularidades la ejecución del Proyecto de Construcción del Terminal de transportes del municipio de Uribia. 4 elefantes blancos por más de $41 mil millones ha detectado la Contraloría General de la República en La Guajira.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Audiolectura comunicado 187

0:00 6:13

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Comunicados de Prensa 2020?

This episode is 6 minutes long.

When was this Comunicados de Prensa 2020 episode published?

This episode was published on April 14, 2021.

Can I download this Comunicados de Prensa 2020 episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.