Automation Minutes 055 - 08.21.2008 episode artwork

EPISODE · Aug 22, 2008 · 18 MIN

Automation Minutes 055 - 08.21.2008

from Gary On Manufacturing - Gary Mintchell · host Gary Mintchell

Recording in the mobile studio, Gary reflects on leadership and energy issues from his trip to Las Vegas to attend the Schneider Electric customer conference. That's two straight weeks of record attendance at conferences in a supposedly down economy. He also discusses the latest Rockwell Automation Integrated Architecture release. He concludes with a discussion of the Packaging Automation Forum.

Episode metadata supplied by the publisher feed · Published Aug 22, 2008

Embed this episode

NOW PLAYING

Automation Minutes 055 - 08.21.2008

0:00 18:40

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Gary On Manufacturing - Gary Mintchell?

This episode is 18 minutes long.

When was this Gary On Manufacturing - Gary Mintchell episode published?

This episode was published on August 22, 2008.

Can I download this Gary On Manufacturing - Gary Mintchell episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!