Avoid Change Orders... Unless You Know These Tips! episode artwork

EPISODE · Sep 28, 2023 · 39 MIN

Avoid Change Orders... Unless You Know These Tips!

from Home Building Insights - Building With Breven · host Breven Homes - Home Building Experts and Consultants

In episode 12 of the Building With Breven podcast, we cover the highs and lows of change orders. Don't miss these tips before discussing change orders with your custom home builder.

Episode metadata supplied by the publisher feed · Published Sep 28, 2023

Embed this episode

NOW PLAYING

Avoid Change Orders... Unless You Know These Tips!

0:00 39:03

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Home Building Insights - Building With Breven?

This episode is 39 minutes long.

When was this Home Building Insights - Building With Breven episode published?

This episode was published on September 28, 2023.

Can I download this Home Building Insights - Building With Breven episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!