B3 1.3.1 Preparing safety measures
from SMCP PART B3 - Cargo and cargo handling
Preparing safety measures .1 Plug the scuppers / drip-trays and report. .1.1 All scuppers / drip-trays are plugged. .2 Close the sea-valves / discharges and report. .2.1 All sea-valves / discharges are closed. .3 Stand by absorbent materials and report. .3.1 Absorbent materials standing by. .4 Stand by spill control gear and report. .4.1 Spill control gear standing by. .5 Stand by emergency fire pump / foam monitor / fire extinguishers and report. .5.1 Emergency fire pump / foam monitor / fire extinguishers standing by. .6 Fit bonding wire and report. .6.1 Bonding wire is fitted. .7 Maintain contact on VHF Channels ... with the bunker barge / oil terminal. .8 Is the oil pollution prevention plan available ? .8.1 Yes, the oil pollution prevention plan is available. .8.2 No, the oil pollution prevention plan is not available (yet). .8.3 The oil pollution prevention plan will be available in ... minutes. .9 Instruct the pumpman / ... and report. .9.1 Pumpman / ... is instructed.
Embed this episode
No transcript yet.