Skip to content
B3 1.3.2 Operating pumping equipment episode artwork

Nov 12, 2015 3 min

B3 1.3.2 Operating pumping equipment

from SMCP PART B3 - Cargo and cargo handling

Operating pumping equipment including: phrases for communication with bunker barge / oil terminal .1 What is the (maximum) loading rate / discharge rate ? .1.1 The (Maximum) loading rate / discharge rate is: ... tonnes per hour. .2 Is the COW - system / inert gas system operational ? .2.1 Yes, the COW - system / inert gas system is operational . .2.2 No, the COW - system / inert gas system is not operational (yet). .2.3 The COW - system / inert gas will be operational in ... minutes. .3 When will crude oil washing start ? .3.1 Crude oil washing will start in ... minutes. .4 Are your tanks inerted? .4.1 Yes, my tanks are inerted. .4.2 No, my tanks are not inerted (yet). .4.3 My tanks will be inerted in ... minutes. .5 What is the pressure in the inerted tanks? .5.1 The pressure in the inerted tanks is ... bar. .6 What is the pumping pressure ? .6.1 The pumping pressure is ... bar. .7 Can we connect the loading arm ? .7.1 Yes, you can connect the loading arm. .7.2 No, you cannot connect the loading arm (yet). .7.3 Connect the loading arm in ... minutes. .8 Inform ... minutes before loading / discharge will start / finish. .8.1 Loading / discharge will start / finish in ... minutes. .9 What is the back pressure for stripping ? .9.1 The backpressure for stripping is... bars. .10 Are the cargo hoses / booms connected ? .10.1 Yes, the cargo hoses / booms are connected. .10.2 No, the cargo hoses / booms are not connected (yet). .10.3 The cargo hoses / booms will be connected in ... minutes. .11 Are the cargo hoses / booms disconnected ? .11.1 Yes, the cargo hoses / booms are disconnected. .11.2 No, the cargo hoses / booms are not disconnected (yet). .11.3 The cargo hoses / booms will be disconnected in ... minutes. .12 Are you ready to load /discharge? .12.1 Yes, I am ready to load / discharge. .12.2 No, I am not ready to load /discharge (yet). .12.3 I will be ready to load / discharge in ... minutes. .13 Keep a safe working pressure. .14 Open the valve(s) and report. .14.1 All full open aboard / ashore. .15 Close the valve(s) and report. .15.1 All full closed aboard / ashore. .16 Start pumping (slowly). .17 Are you pumping / receiving ? .17.1 Yes, I am pumping / receiving. .17.2 No, I am not pumping / not receiving. .18 Increase / decrease pumping rate to ... revolutions / bar.. .19 (Quantity received) - stop pumping.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

B3 1.3.2 Operating pumping equipment

0:00 3:28

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of SMCP PART B3 - Cargo and cargo handling?

This episode is 3 minutes long.

When was this SMCP PART B3 - Cargo and cargo handling episode published?

This episode was published on November 12, 2015.

Can I download this SMCP PART B3 - Cargo and cargo handling episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.