Skip to content
B3 1.3.4 Ballast handling episode artwork

Nov 12, 2015 <1 min

B3 1.3.4 Ballast handling

from SMCP PART B3 - Cargo and cargo handling

Ballast handling .1 Plug the scuppers and report. .1.1 All scuppers are plugged. .2 Open / close the sea suction valve / ballast tank valve no. ... and report. .2.1 Sea suction valve / ballast tank valve no. ... is open / closed. .3 Start the ballast pump and report. .3.1 Ballast pump started. .4 Stop the ballast pump (- ballast overflow!) and report. .4.1 Ballast pump stopped. .5 Pump out ballast tank no. ... and report. .5.1 Ballast tank no. ... is pumped out. .5.2 Stop the ballast pump - ballast dirty !

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

B3 1.3.4 Ballast handling

0:00 0:46

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of SMCP PART B3 - Cargo and cargo handling?

This episode is 0 minutes long.

When was this SMCP PART B3 - Cargo and cargo handling episode published?

This episode was published on November 12, 2015.

Can I download this SMCP PART B3 - Cargo and cargo handling episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.