Bathroom Remodeling | Hour 2 episode artwork

EPISODE · Apr 20, 2026 · 28 MIN

Bathroom Remodeling | Hour 2

from Home with Dean Sharp

• Contractor timelines → why real projects require weeks of prep before a fast on-site build• Red flag: “I can start Monday” → likely delays due to missing materials and poor planning• Custom elements → cabinets, finishes, and especially glass shower doors drive timelines• Shower glass reality → measured after install, built to exact specs, adds ~1–2 week delay• Setting expectations → clear communication upfront prevents frustration mid-project• In-house vs suppliers → most work controlled internally, with select material partners (like glass)• Listener Q: “weep holes” in showers → myth vs reality, proper drainage happens at the drain system, not through wall openings • Listener Q: flooring choices → laminate vs luxury vinyl plank, durability, waterproofing, and sound considerations in multi-unit homesSee omnystudio.com/listener for privacy information.

Episode metadata supplied by the publisher feed · Published Apr 20, 2026

Embed this episode

Ready to play

Bathroom Remodeling | Hour 2

0:00 28:47

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Home with Dean Sharp?

This episode is 28 minutes long.

When was this Home with Dean Sharp episode published?

This episode was published on April 20, 2026.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Home with Dean Sharp episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!