EPISODE · Mar 17, 2026 · 2 MIN
Baustart für Pipeline: Künstlicher See statt Tagebau
from WDR 2 Das Thema · host Marlis Schaum
Vom Tagebau zum Hambacher See: Über eine rund 45 Kilometer lange Pipeline will RWE Wasser aus dem Rhein bis in den Tagebau pumpen. Die Bauarbeiten für die Transportleitung starten nun in Elsdorf und am Rhein in Dormagen. Von Marlis Schaum.
Embed this episode
Ready to play
Baustart für Pipeline: Künstlicher See statt Tagebau
0:00
2:34
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of WDR 2 Das Thema?
This episode is 2 minutes long.
When was this WDR 2 Das Thema episode published?
This episode was published on March 17, 2026.
Can I download this WDR 2 Das Thema episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!