EPISODE · Jun 26, 2017 · 32 MIN
Behind Goldwind’s stunning low wind contract
from Energy Insiders - a RenewEconomy Podcast · host RenewEconomy
Goldwind CEO John Titchen on record low wind costs, wind/solar hybrids and another big wind farm, the Finkel Review and why Tasmania should get an extra connection to mainland to be the “renewable battery”.
Embed this episode
NOW PLAYING
Behind Goldwind’s stunning low wind contract
0:00
32:34
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Energy Insiders - a RenewEconomy Podcast?
This episode is 32 minutes long.
When was this Energy Insiders - a RenewEconomy Podcast episode published?
This episode was published on June 26, 2017.
Can I download this Energy Insiders - a RenewEconomy Podcast episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!