BHS e286-Aqueducts and Water Works episode artwork

EPISODE · Jan 1, 2021 · 6 MIN

BHS e286-Aqueducts and Water Works

from The Brattleboro Historical Society Podcast · host Brattleboro Historical Society

A water tower on Western Avenue...until 1925 Brattleboro residents purchased water from up to twelve different private water systems, the last private aqueduct ceased operations in 1958 because of the arrival of Interstate 91. This is the story...

Episode metadata supplied by the publisher feed · Published Jan 1, 2021

Embed this episode

NOW PLAYING

BHS e286-Aqueducts and Water Works

0:00 6:44

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Brattleboro Historical Society Podcast?

This episode is 6 minutes long.

When was this The Brattleboro Historical Society Podcast episode published?

This episode was published on January 1, 2021.

Can I download this The Brattleboro Historical Society Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!