碧听的故事:迟到但精彩 Behind Schedule, Ahead in Love episode artwork

EPISODE · Aug 26, 2025 · 13 MIN

碧听的故事:迟到但精彩 Behind Schedule, Ahead in Love

from 碧听的故事 | Let BI Tell You A Story · host Mediacorp

In a relationship, one often arrived late due to helping others, but proved their sincerity through actions. The other learned to transform frustration into patience. In the end, they realized love isn’t about punctuality, but about turning waiting into an act of love. 一段感情中,总有人因帮助他人而常常迟到,却用行动证明真诚与善良。另一方从不满到理解,学会了等待的意义。最终,两人明白:爱情不是让人变得准时,而是让等待成为爱的练习。See omnystudio.com/listener for privacy information.

Episode metadata supplied by the publisher feed · Published Aug 26, 2025

Embed this episode

NOW PLAYING

碧听的故事:迟到但精彩 Behind Schedule, Ahead in Love

0:00 13:14

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of 碧听的故事 | Let BI Tell You A Story?

This episode is 13 minutes long.

When was this 碧听的故事 | Let BI Tell You A Story episode published?

This episode was published on August 26, 2025.

Can I download this 碧听的故事 | Let BI Tell You A Story episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!