Skip to content
Big Dig Podcast Episode 6 - Transit-Oriented Development episode artwork

EPISODE · May 13, 2019 · 30 MIN

Big Dig Podcast Episode 6 - Transit-Oriented Development

from The Big Dig · host bldup.com

On this episode of The Big Dig, Peter Paravalos, Director of Transit-Oriented development for the MBTA, Bryan Koop, EVP Boston region, Boston Properties, Elizabeth Grob, New England Real Estate Leader at VHB, and David Bois Principal at Arrowstreet discuss how the T is working with developers to drive projects centered around 200 years of transit infrastructure. Our panel touches on The Hub on Causeway, The Back Bay/South End Gateway, and the upcoming South Station project along with the importance of development teams bringing the MBTA to the table early to handle the tough challenges associated with these complicated projects.

Episode metadata supplied by the publisher feed · Published May 13, 2019

Embed this episode

Ready to play

Big Dig Podcast Episode 6 - Transit-Oriented Development

0:00 30:59

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Big Dig?

This episode is 30 minutes long.

When was this The Big Dig episode published?

This episode was published on May 13, 2019.

Can I download this The Big Dig episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!