Skip to content
Bond Project Update: October 2025 episode artwork

Oct 1, 2025 3 min

Bond Project Update: October 2025

from Listen to the Story Hosted by Bethel School District

Thank you, voters! Construction on the New Bethel High School broke ground in 2024 and is scheduled to be completed in 2026. At almost 300,000 square feet, the New Bethel High School is a massive project. Exterior brickwork is going up on the building, the student parking lot has been paved, and the new turf field and track look amazing!

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Bond Project Update: October 2025

0:00 3:39

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Listen to the Story?

This episode is 3 minutes long.

When was this Listen to the Story episode published?

This episode was published on October 1, 2025.

Can I download this Listen to the Story episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.