Skip to content
BONUS EPISODE: The Lifetime Impact of Free Travel for Your Family + "Snowbirding" FREE with Cathy S. episode artwork

EPISODE · Apr 29, 2021 · 21 MIN

BONUS EPISODE: The Lifetime Impact of Free Travel for Your Family + "Snowbirding" FREE with Cathy S.

from Families Fly Free With Lyn Mettler · host Lyn Mettler

Families Fly Free member, Catherine S., a new retiree, shares how the membership has been key to her "snowbird strategy" to travel as often as possible between her homes in Connecticut and Florida. Plus, she shares all of the unexpected benefits of membership like help with planning where to travel. Become a member of Families Fly Free and get all the same benefits of Cathy below... Families Fly Free Download our FREE list of 7 INSIDER hacks Lyn uses to fly her family free: https://familiesflyfree.com/7hacks This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit lynmettler.substack.com

Episode metadata supplied by the publisher feed · Published Apr 29, 2021

Embed this episode

Ready to play

BONUS EPISODE: The Lifetime Impact of Free Travel for Your Family + "Snowbirding" FREE with Cathy S.

0:00 21:33

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Families Fly Free With Lyn Mettler?

This episode is 21 minutes long.

When was this Families Fly Free With Lyn Mettler episode published?

This episode was published on April 29, 2021.

Can I download this Families Fly Free With Lyn Mettler episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!