EPISODE · Sep 13, 2026 · 1 MIN
Bridge Replacement Blocked by City | Boise News
from Boise News Today | 2 Min News | The Daily News Now!
Boise’s Planning Commission just derailed a $33.7 million bridge replacement project — the old Eckert Road Bridge, dating back before the highway district even existed, is crumbling with decaying support piles. Construction was set to begin this October, but the commission voted 4-3 against the permit, calling the new design too big, too loud, and out of sync with city vision — despite staff recommendations. The upgraded bridge would be taller, wider, and longer, but proponents say it’s greener, with better runoff control and fewer pilings in the water. The City Council will decide September 29th — a showdown between safety and style. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Sources:https://www.idahostatesman.com/news/local/community/boise/article317171650.html More coverage & latest updates:https://sources.thednn.ai/62018f620cec0eec Report issues to [email protected].
Embed this episode
Ready to play
Bridge Replacement Blocked by City | Boise News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.