Bridge work alters L trains in Loop
from Chicago All Local
Some Green and Pink Line riders will have to change their commute while a construction project in the Loop closes the Lake Street Bridge. The CTA has been sending workers out at Green and Pink Line stations to alert riders about changes that start next Tuesday. Replacement of train tracks and other parts of the double-decker bridge will mean no Pink Line trains will run in the Loop.
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of Chicago All Local?
This episode is 0 minutes long.
When was this Chicago All Local episode published?
This episode was published on October 7, 2026.
Can I download this Chicago All Local episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.