British Columbia Flooding Update
from Depictions Media Hosted by Michael Clogs
Drivers can expect overnight delays between Prince Rupert and Chetwynd from Dec. 9-13, 2021. During this time, large commercial vehicles will transport oversized cargo that requires a full closure on sections of the highway. This ensures the safe transport of cargo and the safety of motorists. All closures are scheduled during times of expected low traffic volumes to reduce the impact on travellers Become a supporter of this podcast: https://www.spreaker.com/podcast/depictions-media--4208927/support.
Embed this episode
No transcript yet.