Skip to content
British Columbia Flooding Update episode artwork

Dec 9, 2021 23 min

British Columbia Flooding Update

from Depictions Media Hosted by Michael Clogs

Drivers can expect overnight delays between Prince Rupert and Chetwynd from Dec. 9-13, 2021. During this time, large commercial vehicles will transport oversized cargo that requires a full closure on sections of the highway. This ensures the safe transport of cargo and the safety of motorists. All closures are scheduled during times of expected low traffic volumes to reduce the impact on travellers Become a supporter of this podcast: https://www.spreaker.com/podcast/depictions-media--4208927/support.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

British Columbia Flooding Update

0:00 23:35

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Depictions Media?

This episode is 23 minutes long.

When was this Depictions Media episode published?

This episode was published on December 9, 2021.

Can I download this Depictions Media episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.