EPISODE · Jul 23, 2026 · 1 MIN
Broadway Tunnel Closure & Upgrades | San Francisco News
from San Francisco News Today | 2 Min News | The Daily News Now!
San Francisco’s iconic Broadway Tunnel is shutting down for a major seismic upgrade and renovation starting August 15th, with a full weekend closure from Saturday morning to Monday morning. The $76 million Chinatown Public Health Center project, built directly atop the tunnel, requires critical structural work. After the initial shutdown, partial closures will last 14 months, with one tunnel bore closed at a time for seven months each—keeping one lane open in each direction. Expect delays, especially during rush hour, with detours via Union and Pacific Streets. The upgrade includes LED lighting and walkway improvements to make the historic 1952 tunnel safer and more user-friendly. This coincides with other Chinatown construction, so check the Public Works site for updates. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/03c82c9d803f17f3
Embed this episode
NOW PLAYING
Broadway Tunnel Closure & Upgrades | San Francisco News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.