EPISODE · Feb 12, 2026 · 4 MIN
Bryan city manager's report at the February 10, 2026 city council meeting
from WTAW - Interviews · host Bryan Broadcasting
This podcast is Bryan city manager Andrew Nelson's report to the city council on February 10, 2026.Some of the report includes:CAPITAL IMPROVEMENT PROJECTS• The roadway work in BRAC is complete, with the narrow asphalt section replaced with a wider concrete roadway.• The Stella Ranch Lift Station is complete and operational.• The contractor has started drilling Well 23, located on the peninsula in Lake Bryan.• The traffic signal construction at Highway 30 and Hardy Weedon has started.• The Highway 6 sewer main contractor began the sewer main replacement work to accommodate the Highway 6 widening. The contractor has installed the water line through the Lowes property and is getting ready to cross Highway 6.• Staff is negotiating a design contract for Williamson, Bomber, and Carson Drives.• Staff is negotiating a design contract South College Phase 3 to complete South College to Downtown.• Staff is negotiating a design contract for Waco Street widening.PARKS AND POOLS UPDATES• Staff continued work at Travis Major Field last week, including repairing the fences, removing poorly maintained, dilapidated, and unwanted structures, and general cleanup of the complex.• Staff began removal of the existing structures at Ibarra Park for the 2-5 years old children’s playground area, with installation of the new playground scheduled for completion by April 30.• The larger playgrounds for ages 5-12 years old will be replaced at Claude Scurry Park and Copperfield Park. Removal of existing structures is planned.
What this episode covers
This podcast is Bryan city manager Andrew Nelson's report to the city council on February 10, 2026.Some of the report includes:CAPITAL IMPROVEMENT PROJECTS• The roadway work in BRAC is complete, with the narrow asphalt section replaced with a wider concrete roadway.• The Stella Ranch Lift Station is complete and operational.• The contractor has started drilling Well 23, located on the peninsula in Lake Bryan.• The traffic signal construction at Highway 30 and Hardy Weedon has started.• The Highway 6 sewer main contractor began the sewer main replacement work to accommodate the Highway 6 widening. The contractor has installed the water line through the Lowes property and is getting ready to cross Highway 6.• Staff is negotiating a design contract for Williamson, Bomber, and Carson Drives.• Staff is negotiating a design contract South College Phase 3 to complete South College to Downtown.• Staff is negotiating a design contract for Waco Street widening.PARKS AND POOLS UPDATES• Staff continued work at Travis Major Field last week, including repairing the fences, removing poorly maintained, dilapidated, and unwanted structures, and general cleanup of the complex.• Staff began removal of the existing structures at Ibarra Park for the 2-5 years old children’s playground area, with installation of the new playground scheduled for completion by April 30.• The larger playgrounds for ages 5-12 years old will be replaced at Claude Scurry Park and Copperfield Park. Removal of existing structures is planned.
NOW PLAYING
Bryan city manager's report at the February 10, 2026 city council meeting
No transcript for this episode yet
Similar Episodes
Mar 26, 2026 ·1m
Jan 2, 2026 ·47m
Dec 21, 2025 ·46m