EPISODE · Jun 9, 2025 · 26 MIN
Building a Wave Pool in the Middle of a European City with Tom Lochtefeld
from Wave Pool Mag
We were lucky enough to catch Tom Lochtefeld at the RiF010 wave pool in central Rotterdam. Tom shared with us how this unique project came into being and why it took 11 long years to complete.
Embed this episode
Ready to play
Building a Wave Pool in the Middle of a European City with Tom Lochtefeld
0:00
26:16
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Wave Pool Mag?
This episode is 26 minutes long.
When was this Wave Pool Mag episode published?
This episode was published on June 9, 2025.
Can I download this Wave Pool Mag episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!