Building a Wave Pool in the Middle of a European City with Tom Lochtefeld episode artwork

EPISODE · Jun 9, 2025 · 26 MIN

Building a Wave Pool in the Middle of a European City with Tom Lochtefeld

from Wave Pool Mag

We were lucky enough to catch Tom Lochtefeld at the RiF010 wave pool in central Rotterdam. Tom shared with us how this unique project came into being and why it took 11 long years to complete. 

Episode metadata supplied by the publisher feed · Published Jun 9, 2025

Embed this episode

Ready to play

Building a Wave Pool in the Middle of a European City with Tom Lochtefeld

0:00 26:16

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Wave Pool Mag?

This episode is 26 minutes long.

When was this Wave Pool Mag episode published?

This episode was published on June 9, 2025.

Can I download this Wave Pool Mag episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!