Skip to content
Building An All Electric Fire Station episode artwork

Jun 10, 2024 23 min

Building An All Electric Fire Station

from Fire Apparatus & Emergency Equipment Hosted by Fire Apparatus & Emergency Equipment

Guest Charlotte (NC) Fire Department Deputy Chief Jerry Winkles discusses the fire department's upcoming all-electric firehouse that will house the department's first electric fire apparatus. Among the topics will be covered the decision to build this type of station, land acquisition for the station, the electric rig the department chose, physical characteristics of the station, and more. Brought to you by OnScene Solutions.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Building An All Electric Fire Station

0:00 23:59

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Fire Apparatus & Emergency Equipment?

This episode is 23 minutes long.

When was this Fire Apparatus & Emergency Equipment episode published?

This episode was published on June 10, 2024.

Can I download this Fire Apparatus & Emergency Equipment episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.