Building Power Plants to Avoid the Grid episode artwork

EPISODE · Aug 18, 2026 · 18 MIN

Building Power Plants to Avoid the Grid

from The Daily Shear · host RippCorp Media

Austin moves 911 dispatch into a standalone office despite objections, Nvidia finances a private gas plant so an OpenAI data center can bypass the power grid, and a disabled Navy destroyer waits for a commercial tow in the Pacific.

Episode metadata supplied by the publisher feed · Published Aug 18, 2026

Embed this episode

Ready to play

Building Power Plants to Avoid the Grid

0:00 18:39

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Daily Shear?

This episode is 18 minutes long.

When was this The Daily Shear episode published?

This episode was published on August 18, 2026.

Can I download this The Daily Shear episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!