Skip to content
Building the world’s biggest DAC facility episode artwork

Jan 8, 2025 35 min

Building the world’s biggest DAC facility

from The Green Blueprint Hosted by Latitude Media

On Christmas Eve 2023, Doug Chan wasn't celebrating with family. Instead, he was in Hellisheiði, Iceland with his team, preparing to commission Mammoth — what would become the world's largest operational direct air capture facility. Getting there wasn't easy. After building two successful smaller plants, Climeworks faced its biggest challenge yet in attempting a 10x scale-up of its Orca plant. When the team broke ground, they discovered issues with their newly designed equipment that forced tough decisions. And Iceland's harsh winter conditions complicated both construction and operations. In this episode, Lara Pierpoint talks to Douglas Chan, chief operations officer at Climeworks, about proving and scaling direct air capture technology. They discuss managing technology risks, choosing the right partners — and what's next as Climeworks plans for an even bigger facility in Louisiana. The Green Blueprint is a co-production of Latitude Media and Trellis Climate. Subscribe on Apple, Spotify, or anywhere you get podcasts. For more reporting on the companies featured in this podcast, subscribe to Latitude Media's newsletter.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Building the world’s biggest DAC facility

0:00 35:10

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of The Green Blueprint?

This episode is 35 minutes long.

When was this The Green Blueprint episode published?

This episode was published on January 8, 2025.

Can I download this The Green Blueprint episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.