Skip to content
Bulls Beat Monday 4-13 Extended: Long Leads Softball to Epic 14-Inning Win, Sweep of FAU; Baseball Grabs win at UTSA After Home-Plate Scuffle; Lacrosse Rolls Plus News on Tennis, Golf, Track, Football episode artwork

EPISODE · Apr 13, 2026 · 54 MIN

Bulls Beat Monday 4-13 Extended: Long Leads Softball to Epic 14-Inning Win, Sweep of FAU; Baseball Grabs win at UTSA After Home-Plate Scuffle; Lacrosse Rolls Plus News on Tennis, Golf, Track, Football

from South Florida Bulls Audio Network · host South Florida Bulls Audio

FOURTEEN INNINGS - and not just from the softball team... from its ace pitcher Anne Long in a truly classic Sunday. Bulls sweep the series and are alone in first place, and in a nice spot in the computer rankings as a result. Baseball loses its series at UTSA but, considering the Roadrunners have now won their last 16 conference sets, the lone victory might be a springboard. Lacrosse locks up a spot in the conference tournament and is alone in first place. NOTE - the show was updated late Monday with tennis, golf, track and field and beach volleyball recaps.

Episode metadata supplied by the publisher feed · Published Apr 13, 2026

Embed this episode

Ready to play

Bulls Beat Monday 4-13 Extended: Long Leads Softball to Epic 14-Inning Win, Sweep of FAU; Baseball Grabs win at UTSA After Home-Plate Scuffle; Lacrosse Rolls Plus News on Tennis, Golf, Track, Football

0:00 54:13

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of South Florida Bulls Audio Network?

This episode is 54 minutes long.

When was this South Florida Bulls Audio Network episode published?

This episode was published on April 13, 2026.

Can I download this South Florida Bulls Audio Network episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!