EPISODE · Jul 14, 2026 · 1 MIN
Burlington’s New Battery Cuts Power Costs | Montpelier News
from Montpelier News Today | 2 Min New | The Daily News Now!
Burlington just approved a game-changing five-megawatt battery for the McNeil plant, poised to slash peak-hour electricity costs and stabilize the grid—saving nearly half a million dollars this year alone, with even bigger savings on the horizon. Owned by a Boston firm but run by local McNeil pros, this smart energy move could be just the start of a bigger, cheaper, more resilient power future. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/eb823304278a2758
Embed this episode
NOW PLAYING
Burlington’s New Battery Cuts Power Costs | Montpelier News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.