Skip to content
Calabo - Session #6 The Last Planner System episode artwork

EPISODE · Aug 20, 2021 · 1H 6M

Calabo - Session #6 The Last Planner System

from Learnings and Missteps by Depth Builder · host Jesse, Rene and Ernest

Jesse & Felipe are rounding 3rd base as they cover Chapter 6 of The Lean Builder. Catch a heavy dose of collaboration cheat codes with a side of attitude from Jesse the grouch. This conversation touches many of the necessities for achieving positive outcomes with LPS, some of which will take practice to master. And many you can apply today. Connect with us at: https://www.learningsandmissteps.com/ Connect with Felipe at: https://www.theebfcshow.com/

Episode metadata supplied by the publisher feed · Published Aug 20, 2021

Embed this episode

Ready to play

Calabo - Session #6 The Last Planner System

0:00 1:06:18

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Learnings and Missteps by Depth Builder?

This episode is 1 hour and 6 minutes long.

When was this Learnings and Missteps by Depth Builder episode published?

This episode was published on August 20, 2021.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Learnings and Missteps by Depth Builder episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!