EPISODE · Aug 27, 2026 · 1 MIN
Calgary’s Water Pipe Replacement on Track | Calgary News
from Calgary News Today | 2 Min News | The Daily News Now!
Calgary’s massive six-kilometer Bearspaw pipe replacement is on track—and under budget—after a rocky past with major water failures in 2024 and 2025. Three point seven kilometers of concrete pipe and over two kilometers of steel are already installed, with global experts helping speed things up. The project, vital for 60% of Calgary’s treated water plus surrounding communities, aims to wrap by December, though expect disruptions: Parkdale Boulevard maintenance, a September electrical shutdown, and mid-October water restrictions as the new pipe connects to the old system. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/ef70fbb9b2135b2f
Embed this episode
Ready to play
Calgary’s Water Pipe Replacement on Track | Calgary News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.