Can we build Data Centers fast enough? | Episode 3 - Live at KickStart Europe 2026

from Inside Data Centre Podcast · host Andy Davis

Send us Fan MailIn this episode, Andy Davis is joined by co-host Pieter Schaap, Director at Soben (Part of Accenture) to discuss the fact that with RFS timelines shrinking to 12-14 months from construction start, the data centre industry is operating at unprecedented speed.  But where are the real bottlenecks?  Joining the discussion:  Miriam van Kooperen, GreenScale Luc Spin, Unica Datacenters Together, they explore supply chain constraints, power and infrastructure pressures, and the creative strategies emerging to meet aggressive timelines.  Recorded live at Kickstart Europe 2026  Topics: The impact of supply chain bottlenecks on data center project timelines Strategies for building effective supplier partnerships amid uncertainty The role of standardization versus customization in hardware procurement Modularization as a solution for accelerating delivery and reducing risks The influence of sustainability and innovation on procurement decisions How market dynamics have shifted from buyer’s market to high-demand environment The importance of transparency, collaboration, and early planning in project success Quick-fire insights: procurement approaches, balancing deadlines and budgets, and industry collaborations https://sobencc.com/ https://greenscaledc.com/ https://www.unica.nl/expertises/datacenters    Support the showThe Inside Data Centre Podcast is recorded in partnership with DataX Connect, a specialist data centre recruitment company based in the UK. They operate on a global scale to place passionate individuals at the heart of leading data centre companies.To learn more about Andy Davis and the rest of the DataX team, click here: DataX Connect

Episode metadata supplied by the publisher feed · Published Feb 27, 2026

Embed this episode

Send us Fan Mail In this episode, Andy Davis is joined by co-host Pieter Schaap, Director at Soben (Part of Accenture) to discuss the fact that with RFS timelines shrinking to 12-14 months from construction start, the data centre industry is operating at unprecedented speed. But where are the real bottlenecks? Joining the discussion: Miriam van Kooperen, GreenScale Luc Spin, Unica Datacenters Together, they explore supply chain constraints, power and infrastru...

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

Can we build Data Centers fast enough? | Episode 3 - Live at KickStart Europe 2026

0:00 31:09

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Inside Data Centre Podcast?

This episode is 31 minutes long.

When was this Inside Data Centre Podcast episode published?

This episode was published on February 27, 2026.

Can I download this Inside Data Centre Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!