Skip to content
Canadian Pacific update part 2 episode artwork

Nov 19, 2019 11 min

Canadian Pacific update part 2

from The MrT Podcast Studio

Episode 24 - Canadian Pacific update part 2 Welcome to the Canadian Pacific update part 2, where I talk to Becky Peacock about the progress made to the boiler and Bulleid coaches over the past year. The project is to restore the Merchant Navy class locomotive, number 35005, Canadian Pacific and two coaches. Oliver Bulleid designed the Merchant Navy class locomotives for the Southern Railway early in the Second World War. They had many innovations - some worked well, others didn't! He also designed the coaches. Oliver Bulleid was a very persuasive person; this allowed him to produce such an innovative design. Canadian Pacific was the fifth locomotive of the class built at the Eastleigh works in 1941. She entered service on 13 January 1942. Canadian Pacific worked hard on passenger and freight trains during the war. After the war the Merchant Navy class hauled the Southampton boat trains and 'named' expresses such as the Bournemouth Belle. On 15th May 1965 Canadian Pacific, pulling a Bournemouth express, reached 105 m.p.h. She was travelling down the Winchester Bank. Sadly Canadian Pacific was withdrawn from service later in 1965. Please click on a thumbnail to open the Coach restoration picture gallery: Find out more about the Watercress Line: To visit the Watercress Line website please follow this link Watercress Line. Bring the family and join us on a Santa Special. They run from Saturday 30th November to Christmas Eve. Click here to find out more. Don't forget Christmas Leave on the 26th and 27th of December. Click here to find out more. About 'Life on the Watercress Line' The next episode of Life on the Watercress Line is in two weeks. This podcast is available on Apple Podcasts/iTunes, Deezer, Spotify and Stitcher. AKM Music has licensed Steam Railway for use as the theme and incidental music.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Canadian Pacific update part 2

0:00 11:56

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of The MrT Podcast Studio?

This episode is 11 minutes long.

When was this The MrT Podcast Studio episode published?

This episode was published on November 19, 2019.

Can I download this The MrT Podcast Studio episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.