EPISODE · Oct 16, 2025 · 37 MIN
Cape Coral Yacht Club 1,700% Cost Overrun & Florida CFO Blaze Angolia Talks Taxes and State Issues
from The Drive with Trey Radel
On today’s episode of The Drive with Trey Radel, we dive into a brewing local controversy — the $1,700 cost overrun on the Cape Coral Yacht Club renovation project. With growing public frustration over budget management and transparency, city commissioner Rachel Kaduk calls in live to address the issue, respond to community concerns, and explain what went wrong.Then, Florida CFO Blaze Angolia joins Trey for a wide-ranging conversation on taxes, insurance, and the state’s economic resilience. From rising property rates to budget priorities and disaster preparedness, Blaze outlines how Florida is staying fiscally strong in the face of national instability.It’s a mix of local accountability and statewide insight — the kind of hard-hitting talk and direct conversation that makes The Drive must-listen radio across Southwest Florida.Hashtags:#TheDrive #TreyRadel #CapeCoral #YachtClubProject #FloridaPolitics #BlazeAngolia #FloridaCFO #LocalNews #TaxTalk #FloridaEconomy #AccountabilityMatters #TalkRadioStay informed and entertained with Trey Radel and Jason Jones weekdays on 92.5 FOX News.The Drive with Trey Radel on 92.5 FOX News Radio in Southwest Florida. Listen LIVE: https://925FOXNews.com Call In Number: 239-479-5592 Copyright © 2025 Sun Broadcasting, Inc.
Embed this episode
What this episode covers
On today’s episode of The Drive with Trey Radel, we dive into a brewing local controversy — the $1,700 cost overrun on the Cape Coral Yacht Club renovation project. With growing public frustration over budget management and transparency, city commissioner Rachel Kaduk calls in live to address the issue, respond to community concerns, and explain what went wrong. Then, Florida CFO Blaze Angolia joins Trey for a wide-ranging conversation on taxes, insurance, and the state’s economic resilience....
NOW PLAYING
Cape Coral Yacht Club 1,700% Cost Overrun & Florida CFO Blaze Angolia Talks Taxes and State Issues
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.