Skip to content
Careful What You Sign! episode artwork

May 2, 2019 26 min

Careful What You Sign!

from Non Toxic Environments Home Health & Wellness Hosted by Andrew Pace

I promise, I do not talk about these issues to alarm you into hiring me or buying the materials I sell. But I know that sometimes it would seem that way. Honestly, when things like this come up, I have no choice than to fire up the podcast machine and record the words that come out of my mouth without a script. Some recent clients have alerted me about language that home builders are using deep in the fine print of their contracts, that basically allows them to use whatever material they wish, no matter the health consequences. For an appointment directly with Andy Pace, please follow this link: www.degreeofgreen.com/appointment

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Careful What You Sign!

0:00 26:37
of matches

Transcript Auto-generated, may contain errors

This week on Nontoxic Environments, we're going to be talking about the state of construction here in spring, summer, 2019. Let's talk about how construction projects are moving along and what to look out for if you are in the market for a new home builder or remodeler. Hello everybody, welcome back to Nontoxic Environments. This is Andy Pace.

This week is going to be a little different in that I wanted to talk about construction and contractors, but I know we've been interviewing some healthy home builders in the last couple of months, Jen and Rusty down in Texas, the fellas at Healthy Home Builders out in New York. I mean, without a doubt, those two companies have been the absolute best builders I've had a chance to work with and especially have here on the show and talk about construction projects. And today I wanted to talk about the contractors that we don't work with specifically. And there's a lot of them, obviously.

There's a lot of contractors that just are uncomfortable with the whole healthy home thing. They are very comfortable with their subcontractors and suppliers that they're used to. So they are afraid to bring somebody new into the mix that could cause a problem on a project, a delay. Something doesn't go exactly the way they plan for.

And I don't blame them. I'll be honest, in the first couple of years of being in this company, having this company, I got really frustrated because I would introduce products to a contractor that my clients are excited to use. They really wanted to use in the project. And I would get a lot of backlash, a lot of grief from these contractors.

I didn't want to use the products because they just didn't trust them. And now I'm talking about the early 1990s, maybe the late 1990s, when Green Healthy Building was still in its infancy stages. And so they may have used a product once that was considered low VOC or zero VOC. And they had problems with it.

Therefore, everything that's like that must also be problematic. So they just refuse to work with anything. The other item was that we found that it wasn't always their fear of a product not working, but it was their fear of missing out on the layer of profit that they could put on to a product before it was built to the client. And I think a lot of the backlash we got was because of that, honestly.

Contractors got used to, especially in the painting business, got used to buying a product at a contractor level and then selling it to the homeowner at retail and keeping that profit margin. And when homeowners would buy, say, a gallon of safe coat from us at their price, and we sell it to everybody at the same price, there was no room left for the contractor to make a margin. And so they pushed back a little bit. And I understand that from a business perspective, it makes sense.

From a customer service point of view, it doesn't really make a lot of sense. But what we're finding now is vastly different from these two issues. And I'll dig into it in a moment here. Let me set the table a little bit.

In the last year, Jay and I have produced 56, 57 episodes of non-toxic environments. In all those podcast episodes, we talk about what is available to you, the homeowner, what's certainly available to the contractors and why we want to use these materials. Why would we advocate for a product like AFM Safe Seal to seal up from Al-Adhoc from Particle Board in plywood? Well, because we know from Al-Adhoc is not good for you.

It's considered a carcinogen, it's a toxin. So why would contractors get upset that we're trying to make the house healthier for the occupants? That's really an interesting question to ask a contractor. And they usually flip the script a little bit and say, well, it's not that we're getting upset, we just don't want you to use anything that would cause delays, that could cause future problems and so forth.

But I'm starting to realize now why contractors and why the construction industry as a whole is starting to push back heavily against the message that Jay and I are pushing out there and others are as well. The two builders we talked about, JS2 and healthy home builders and there are others. But when you get mainstream construction companies like those two companies building healthy, what that does is gives consumers a reason to question anything that's built that isn't built healthy. And this is why they're pushing back.

The fear is if a contractor acknowledges that they are now using healthier alternatives, they are now using materials that could make the home healthier or will for the clients, they must now also admit to the fact that what they used before this project may have been dangerous, may have been toxic, may have caused indoor air quality issues, could have contributed to health issues. If you admit that what you're doing now is healthy, by definition, what you used to do must have been unhealthy. Now, they're not doing it on purpose. I don't know of any contractor that purposely uses unhealthy materials in their homes.

I know of many contractors that purposely use materials that they are comfortable with, they are used to that meet their price point, that perform the way they want them to perform, and that they are unhealthy, but that's not why they use them. They use them for all those other reasons. So, I wanted to spell the myth that I believe that all contractors are out there to poison their clients. That is absolutely false.

They are not. They are out there to, for the most part, provide the best and finished project for their clients that they can provide based upon their knowledge and the materials that they are used to using. However, they also have to acknowledge the fact that what they have been using now is being proven to be not the healthiest materials. All we want them to do is open up their eyes, open up their minds a little bit, see things from the perspective of a potential client, and let's try to make those projects safer and healthier.

This is why I say they're pushing back even more. It's almost as if they're doubling down on this because they understand that once the snowball starts running down the hill and turns into a giant snow boulder, there's no stopping it, and it's going to affect the way they do their job, and nobody likes to change. So, let me, I'm going to read you something from a contract that I just was asked to review for one of my consulting clients, and yeah, I think you'll get the picture right away. Now, remember, I've been advocating the addition of a line item or a caveat into your construction contract that you have to write in to every contract you signed with your builder that says, all materials used on this project shall be approved for use by our environmental or healthy building consultant.

Any material used without prior approval will be subject to removal and replacement at contractor's cost, and that gives you now the ability to say yes or no. If you don't know what they're using, you can get all the information you need, and then say, we got something else, move on. It also allows you to interject this information during the design and drawing process to make sure they're budgeting properly for materials that should be used. You know, I consult and project all over the world, and when it's a new construction project that I'm involved in early on, this gets added to the contract, and then every single material that goes into the house I, myself, will tell you if it's something that we as a team should approve.

I'll provide all the information you need about the health and safety of it. We'll go through the factors of what are the pros and cons, what are the alternatives, what's the price point, is going to meet the budget, is going to meet the aesthetic, and then it gets approved, check mark, move on to the next one. So by adding that into the contract, it gives you the ability to make sure there are no surprises. What you don't want to have happen is you walk onto the job site after the rough carpenters are done framing, and they start putting in either electrical or plumbing or something like that, and somebody's using something that sets off a headache, a migraine, you know, you instantly get that reaction, and you stop the job and say, why are you using this product?

This happens all the time, folks. Let me be honest with you. If you have this written into the contract, it's a matter of calling the project manager and saying this is not the material that we approved, take that out before you do any more, and start using the correct product, so it gives you a lot of power. Lately, what's been happening is contractors are preempting this, and they're adding this caveat into their contract, and I'll read this for you, because this is, in my opinion, appalling.

So this is a part of a contract that I just looked at. It says under a section called chemicals, every home contains products, materials, and industrial chemicals that are used in constructing the home, which may cause allergic or other bodily reactions in certain individuals. You should consult your physician to determine the chemicals that may adversely affect you, or members of your family. The construction products used in building your home contain, among others, some of the following chemicals in measurable amounts, water or moisture, contains or allows the growth of molds, mildew, and fungus.

Formaldehyde, example, can be found in carpeting and pressed wood products. Arsenic, found in treated wood products. Now, I'm not going to comment on everything because I'll wait until the end here, but I have a comment for that. Fiberglass, example, used in insulation products.

Petroleum and petroleum products, used in vinyls and plastics. Methylene chloride, found in paint thinners. If you are not comfortable, here's the kicker, folks. It says right on this list, if you are not comfortable with the fact that those chemicals or substances will exist in some amount, in the home you are purchasing, you should not purchase this home.

Stunning. If you are not comfortable with the fact that these chemicals or substances will exist, in some amount, you should not buy this home. So, the construction company is admitting the fact that they use all these materials. Now, in that list, you can certainly say that, okay, water, yes, can contribute to mold growth.

From Aldehide, yeah, it's found in a lot of products. We've done numerous episodes of the podcast about this. Arsenic, found in treated wood products. Well, Arsenic was outlawed a dozen years ago, or at least several years ago.

And it's now no longer allowed in treated wood. Fiberglass, there's nothing wrong with fiberglass provided that the fiberglass shard itself is either contained a certain size or dissolvable. So, the fact that they warn people about that is a little interesting. Petroleum and petroleum products.

Now, this one's a big, big, big grouping. I mean, if it's not a natural material, by definition, it's then a petroleum or petroleum product. Everything's derived somehow from synthetics, which have been contained petroleum materials. And then methylened chloride in paint thinners.

Again, that's a random list. You're going to have all these materials on there. And then methylened chloride, it's used so infrequently in paint thinners for paints that haven't been used in 40 years. I'm not sure why that one's on the list.

I'm not trying to make fun of this. I just don't understand it. So, what the builder is telling you is, if you sign this contract, you need to understand that we're going to be using toxic material. Some toxic materials in your home and you just have to live with it.

So, they're acknowledging the fact that the materials that they use and the methods that they use can be a health hazard. So, they get it. It used to be that contractors didn't get it. They just didn't think there was anything wrong that they did.

Now, they understand it. They just don't care. At least that's what I'm getting out of it. They just don't care.

And if you sign this contract and this little paragraph is stuck somewhere in the fine print, you are out of luck because they'll say, you know, reach a contract. We use these materials. And this is why I asked that we add in that caveat that says that we get to approve everything. Now, this particular client that's contracted I'm reading, I'm glad I had a chance to read this and review it and report on it because my customer was made well aware that this little paragraph exists because I told them that's got to be xed out and replaced with wording that is more consumer friendly, not contractor friendly.

I'm interested to see how that works. So, that's probably the biggest thing that I see that's different right now in the construction industry is that contractors are now understanding that their practices are not as healthy as it could be. But instead of just ignoring it instead of, you know, just trying to sidestep it, they're actually running into it face first and saying, no, we know. We know it's not the safest.

But you sign the contracts, you have to live with it. So, I think this is going to be used in in builders contracts all over the country. I've found this example in various forms now with contracts written by contract tours, builders, and all parts of the country in the last six months. It must be something that's being added by through the builders associations in order to protect yourself against possible legal issues in the future.

And so, their legal team is asking everybody to add this to their contracts. So, look out for that. Next thing I wanted to talk about is timing. One of the big questions we've been getting lately is the timing of doing projects and including the expense of this.

Folks, new home construction right now, in my opinion, has never been more expensive. And I hate to say this because I make a living off of working with people who are building new homes. But there's no sense in trying to hide this fact that right now it's very expensive to build a new home. Why is that?

It's not necessarily because of the cost of materials. Materials have not shot up in the last 12 months. Matter of fact, a lot of materials have leveled off in those price increases because we don't have that massive increase in the cost of oil we had many years ago that caused any synthetic petroleum-based products, plastics and so forth to jump up in price sometimes doubling the cost. So, what's happening now though is that unemployment is so low across the country that anybody who is employable is already employed, meaning contractors who rely on skilled labor are having a hard time even finding runners and handymen to work with them.

They just do not have the hands. They don't have the bodies to do the work that's being required of them. In the late 2000s when we entered into that last great recession, a lot of contractors and builders who couldn't afford to stay in business in the home building remodeling industry retooled. And a lot of those skilled laborers, skilled workers who had such valuable knowledge of how to put things together, they left the industry completely to learn other trades because the building industry suffered so badly.

And now that we're back into this high-volume economy of projects going on, there's not enough people to do the work and the cost of labor then, supply and demand, cost of labor is going up. And that's really the main reason why new construction costs so much more right now. I heard a figure just a few weeks ago that let's say you're living in a 2000 square foot home that was built 40 years ago. And obviously the price is different all over the country.

I'm not going to give you a price. What I will say though is whatever that home value is on a resale level, if you wanted to build that exact same home, same square footage, same materials in the same area, that home's going to cost you $60,000 to $100,000 more to build new than it would be to just to buy existing for the exact same property. And the reason for that is because of the cost of labor to put your home together. And now it's not only the cost of it, it's the time it takes to do it.

Fewer people available to do the work, which is what causes the price to go up, but also what causes the build time to go up, where it used to take six to eight months to build a new home in some parts of the country. They're looking at 15 to 18 months, doubling, tripling even in some situations, the time it takes to build a new home. You add into that the time it takes and the cost of getting your permits, legal standpoint, because of regulations that have been put in place over the last eight years, have really slowed down the process. So things are taking longer, costing more.

And so because of those two issues, in my opinion, because things take longer and cost more, it's more imperative that if you're going to go through the time and expense and the trouble of building that new home that you want to do it right, and you want to do something that's going to last, you know, take the test of time, and which means quality, health, durability, sustainability. And so with that, I ask that if you are in the process or you're thinking about building a new home, reach out to me. My consulting services can be found at degreeofgreen.com, the greendesigncenter.com. You can email directly at Andy at degreeofgreen.com.

Set up a 15 minute appointment, set up an hour appointment. Honestly, folks, what I do almost all day long is I work with consumers all over the world and answer questions, troubleshoot, and then help them in their design and construction of their home. And I can work with you either on a appointment by appointment basis, or I do have an option for a full year contract if you're doing a whole new project. So if you want information about that, reach out to me at Andy at degreeofgreen.com.

And I'll be happy to point you in the direction of my online scheduling software so you can make an appointment. Like I said, I do appointments in 15 minute increments. And for some folks, that's all they need. 15 minutes, answer a few questions, solve their problems for the week and they're good.

For others, we dive deep into the project and we actually look at ways, different ways to do things in a helpful and cost-effective manner. And the notes for the podcast, I'll actually put a link directly to my appointment scheduling software. And like I said, even if it's a few questions and you're just sick and tired of doing your own research and you want somebody with 28 years experience answering those questions, so you don't have to worry about it anymore. Hopefully I can be that expert for you.

On that note, folks, it's always a pleasure doing an episode of Non-Toxic Environments for you. Unfortunately, Jay wasn't able to meet with me this week, but he'll be back next week with another fantastic episode of Non-Toxic Environments. Finally, please go to iTunes and leave us a rating and a review of Non-Toxic Environments. We've been blessed with so many good reviews and ratings of our show.

Thank you so much for listening. Honestly, I can't believe that people listen to the show. I say that because I've been doing this for so long and it's so much fun to work with people all over the country, all over the world, and the fact that people are actually listening to the show and reacting so positively to it, it just makes me feel wonderful. And so thank you so much for that.

And so please leave a review which will help others find the show then in the future. And if you have any ideas for upcoming shows, we're always interested in hearing your ideas. We've got one coming up about Feng Shui, we've got one coming up about some new building rating systems, and then other shows coming up about new materials, new methods. But beyond that, if you ever have any ideas about what we should talk about here on the show, so please reach out, either send me an email or go right to our website degreeofgreen.com on the top left of the front page, there's a little microphone that's called a Speakpipe app.

Click on that and through your computer, you can actually leave us a voicemail. And we get tons of these every week. It's fantastic. I respond to as many as I can, as quickly as I can.

I appreciate your patience. But if you have any ideas for shows, we'd love to know what you're interested in hearing. And hopefully, if we pick your topic, we'll give you a little shout out. So thank you so much for listening.

I hope you enjoyed this week's episode, and we'll be back next week. Take care.

Frequently asked questions

How long is this episode of Non Toxic Environments Home Health & Wellness?

This episode is 26 minutes long.

When was this Non Toxic Environments Home Health & Wellness episode published?

This episode was published on May 2, 2019.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Non Toxic Environments Home Health & Wellness episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.