Skip to content
Case Study: Coating the Historic Mackinac Bridge episode artwork

Dec 4, 2020 24 min

Case Study: Coating the Historic Mackinac Bridge

from AMPP Interview Series Hosted by naceinternational

Steve Vlahakis, owner of Seaway Painting, describes the ongoing work by his crews to recoat the towers of the historic Mackinac Bridge, which connects the upper and lower peninsulas of Michigan. Topics include the development of a movable scaffold system to access the structure; benefits of the zinc-epoxy-urethane coating system in a bridge environment; and various application tips and tricks used to complete the large job. The complete story on their work can be read at CoatingsPro Magazine.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Case Study: Coating the Historic Mackinac Bridge

0:00 24:22

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of AMPP Interview Series?

This episode is 24 minutes long.

When was this AMPP Interview Series episode published?

This episode was published on December 4, 2020.

Can I download this AMPP Interview Series episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.