Changes Regarding Preliminary Scope Statement and Collect Requirements at PMBOK 4th Edition episode artwork

EPISODE · Aug 2, 2009 · 5 MIN

Changes Regarding Preliminary Scope Statement and Collect Requirements at PMBOK 4th Edition

from 5 Minutes Podcast with Ricardo Vargas · host Ricardo Viana Vargas

In this podcast, Ricardo talks about the changes related to the Integration and Scope Management at the PMBOK Guide 4th edition. He discusses the removal of the process related to the preliminary scope statement and the insertion of the process to collect requirements as the first process of scope management. Moreover, Ricardo analyses the reasons, the implications and the benefits of the change.

Episode metadata supplied by the publisher feed · Published Aug 2, 2009

Embed this episode

NOW PLAYING

Changes Regarding Preliminary Scope Statement and Collect Requirements at PMBOK 4th Edition

0:00 5:10

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of 5 Minutes Podcast with Ricardo Vargas?

This episode is 5 minutes long.

When was this 5 Minutes Podcast with Ricardo Vargas episode published?

This episode was published on August 2, 2009.

Can I download this 5 Minutes Podcast with Ricardo Vargas episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!