EPISODE · Jul 14, 2026 · 45 MIN
CleanSpark’s $6.6B Sandersville Deal, NY Data Center Moratorium, Keel’s Sherbrooke Land Grab
from Blockspace: AI & Bitcoin · host Blockspace
Welcome back to The Blockspace Podcast! For our lead story, CleanSpark has signed a 20-year, $6.6 billion deal for its Sandersville, Georgia site, with the tenant also holding exclusivity on CleanSpark’s Texas buildouts. For today’s interview, AnchorWa...
Embed this episode
NOW PLAYING
CleanSpark’s $6.6B Sandersville Deal, NY Data Center Moratorium, Keel’s Sherbrooke Land Grab
0:00
45:11
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Blockspace: AI & Bitcoin?
This episode is 45 minutes long.
When was this Blockspace: AI & Bitcoin episode published?
This episode was published on July 14, 2026.
Can I download this Blockspace: AI & Bitcoin episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!